57NETWORK
  • About Us
    • VALUES
  • Our Solutions
    • Smartsheet >
      • Smartsheet FAQ
    • BrandFolder
    • Bitdefender >
      • Bitdefender FAQ
    • ClickUp
    • Cloud PBX + SIP
  • Blog
  • Events
  • CONTACT US

The Ultimate Guide to Project Management for Manufacturing Industry (2025)

6/18/2025

 
Reported by: Shahirah Abdul Aziz
Picture
Manufacturing project management is a high-stakes endeavour. With supply chain disruptions, workforce shortages, and rapid technological advancements, manufacturers must adopt robust project management strategies to maintain efficiency, quality, and profitability. Whether you're implementing smart factories, optimizing production lines, or ensuring compliance with industry standards, effective project management is critical. This blog post explores the key challenges in manufacturing project management, best practices to overcome them, and how tools like Smartsheet can streamline your operations.
Steps in Manufacturing Project Management
A well-defined project lifecycle ensures smooth execution. Here’s a breakdown of the key phases:
  1. Project Initiation
    • Define scope, objectives, and feasibility (e.g., cost-benefit analysis).
  2. Planning & Resource Allocation
    • Develop timelines, assign tasks, and secure materials.
    • Use Gantt charts to visualize dependencies (e.g., Smartsheet’s timeline view).
  3. Execution & Monitoring
    • Track progress, manage risks (e.g., machine downtime), and ensure quality control.
  4. Closing & Evaluation
    • Conduct post-project reviews to identify inefficiencies and improve future processes.


Common Issues in Manufacturing Project Management
Manufacturers face several challenges, including:
  • Resource Shortages – Difficulty tracking labour and machine availability.
  • Supply Chain Delays – Unpredictable material shortages.
  • Manual Data Entry Errors – Spreadsheets lead to costly mistakes.
  • Lack of Real-Time Visibility – Managers can’t track progress efficiently.
These issues can lead to cost overruns, missed deadlines, and quality defects if not managed proactively.


Best Practices for Project Management in Manufacturing
To mitigate risks, follow these proven strategies:
Standardize Processes with Templates
  • Use pre-built manufacturing templates for production schedules, QC checks, and maintenance logs.
Automate Routine Tasks
  • Set up approval workflows for change orders or auto-assign tasks based on triggers.
Improve Cross-Functional Collaboration
  • Share real-time sheets with suppliers, engineers, and floor managers to align priorities.
Monitor Critical Paths Proactively
  • Color-coded Gantt charts highlight high-risk delays before they escalate.


Smartsheet: The Ultimate Project Management Tool for Manufacturing
Manufacturing projects demand real-time visibility, resource optimization, and compliance tracking, Smartsheet delivers exactly that. Its dynamic features help manufacturers streamline workflows while maintaining quality and efficiency.

Real-World Impact: How a Global Manufacturing Company Scaled Efficiency with Smartsheet

A global manufacturing company specializing in flow control equipment faced ongoing challenges with manual, paper-based tracking and disconnected communication across teams in over 50 countries. After implementing Smartsheet, they achieved:

  • A 50-day reduction in pump repair report cycle time
  • An 8% improvement in on-time delivery of final reports
  • Over $80,000 in cost savings by identifying and addressing recurring errors through historical data tracking

By replacing spreadsheets and email chains with automated workflows, the company enabled more seamless collaboration between remote teams and external suppliers, unlocking visibility and efficiency that was previously unattainable.
Read their success story here.

Key Smartsheet Features for Manufacturing:
Production Scheduling & Gantt Charts
  • Visualize timelines, dependencies, and critical paths for assembly lines.
Automated Quality Control Workflows
  • Standardize inspections and non-conformance reports (NCRs) with approval chains.
Inventory & Supply Chain Tracking
  • Monitor raw material levels and supplier lead times in real-time dashboards.
Regulatory Compliance Management
  • Automate ISO documentation and audit prep with templated workflows.

Conclusion

In 2025, manufacturers must balance speed, cost, and compliance to stay competitive. By adopting hybrid methodologies, predictive analytics, and collaborative tools like Smartsheet, teams can reduce waste, accelerate production, and mitigate risks.

Ready to optimize your manufacturing workflows?

At 57Network, we specialize in modern work management, cybersecurity, and business connectivity—empowering organizations to work smarter, safer, and more collaboratively. With tailored solutions and expert training, we help teams unlock their full potential and thrive in today’s digital landscape. Ready to transform the way you work?  Connect with us today.

    Categories

    All
    Company Events & News
    Resources For Managers
    Work Management Trends
    Work Productivity Tips

Care line: +603-9212 0157

Leave us your inquiry

Contact us
Picture
Reach us via Whatsapp

Picture
Picture
Picture
Picture
This company is registered with the Ministry of Finance, Malaysia.

​
Equip your organisation with digital solutions & training that inspire innovation and joy at work.
Copyright © 2025 57Network Consultancy Sdn. Bhd.
Company Registration number : 202001020346 (1376666-K) 
All rights reserved.

 Privacy Policy ​ | ​Integrity Pledge | Site Map

  • About Us
    • VALUES
  • Our Solutions
    • Smartsheet >
      • Smartsheet FAQ
    • BrandFolder
    • Bitdefender >
      • Bitdefender FAQ
    • ClickUp
    • Cloud PBX + SIP
  • Blog
  • Events
  • CONTACT US